“Ticking every box for an office ready for the future”
Texte Valérie Couplez | Photos Ekkow

For VEGA, an office is more than just a building. Above all, the new head office had to be a place where its nineteen employees could feel at home. Industrial Automation’s tour of the new premises clearly showed that the company had more than achieved its goal. The industrial look of the space did nothing to diminish the warmth we felt.
VEGA’s old and new premises, on the outskirts of Brussels, are 1.4 kilometres apart. “Keeping that distance to a minimum was the main criterion when looking for a new site. After all, we are moving for our employees. Following the growth of recent years, the premises dating from the 1970s no longer offered enough space. We could no longer even fit everyone on one floor, whereas at VEGA we firmly believe in togetherness. Our new head office had to bring us together again, quite literally, and be close by, so that we could keep everyone on board,” begins Peter Leemans, managing director of VEGA SA.

1,500 m²
That did not make the search for a new site any easier, however. It ultimately took five years and ended with the construction of a new building on Alfons Gossetlaan in Dilbeek, on the site of the former Corelio printing works. For the past few months, VEGA has occupied an entire floor at number 36, covering just under 1,500 m². VEGA’s distinctive yellow is the building’s leitmotif. It connects every area, from the kitchen and three meeting rooms to the flexible workstations, creating a particularly welcoming workplace. The design is by Captif. “The idea from the outset was to bring a warm touch to the office. The Covid pandemic certainly helped many companies discover remote working, but for us it was above all an opportunity to realise just how important informal conversations around the coffee machine are. You need to give your employees a good reason to come to head office. That’s what we’re trying to do here, with ergonomic chairs, sit-stand desks, a relaxation area… and even showers.”

Training room
Mission accomplished, as far as VEGA’s nineteen employees are concerned. Peter Leemans: “One of our field-based employees has already joked that he now prefers to stay a little longer in the world’s most beautiful head office. We hope everyone enjoys being here.” The building is therefore much more than simply a step forward and an increase in size. “We’ve been able to tick every box to create a head office that’s ready for the future,” comments Pieter Leemans as he shows us around the new premises. A training room for customers was high on the wish list. “In the past, we solved this by going to our customers. But not all the equipment is easy to transport.” He points to the two demonstration models, which are clearly quite heavy and take up a lot of space in the training room, which also has its own kitchen and terrace. “We’ve already held our first training sessions. In time, we want to offer a comprehensive programme, from theoretical courses to hands-on training in highly specific solutions. We’re also looking to be recognised as a service provider in the SME portfolio, but in any case, everyone leaves with a certificate.”

State-of-the-art technology
And of course, state-of-the-art technology was a must. “There are solar panels on the roof, we heat the building with heat pumps, there’s a ventilation system, controlled solar shading, charging points for company vehicles… In short, we’re now working in a near-zero-energy office,” says Peter Leemans with a smile. All that remains is to take care of the final details before the official opening. “The car park has just been built. The signage still needs to be installed. The landscaping still needs to be done… but we’re very happy to be here already, and we’re looking forward to sharing it with our customers.”
Een zakelijke vraag aan VEGA N.V.? Get in touch
Companies in this story
Keep following this
Get an email when a new story is published. No account needed.
- SubjectNews
- CompanyVEGA N.V.




















