360 m2 platform for new production line
Text Valérie CouplezImage Pivaco

The sauces department at Greenyard’s site in Limburg had a new production line installed and needed a new industrial platform. The global market leader in fresh, frozen and prepared products called on Pivaco to extend its elevated work platform. The aim? To improve movement from one area to another, across the production lines.
Greenyard is a well-known name in the food industry. It is the global market leader in fresh, frozen and prepared products: fruit and vegetables, flowers and plants. The company provides customers with efficient and sustainable solutions through best-in-class products, leading innovation and excellent service. Greenyard aims to contribute to a healthier future by helping people enjoy fruit and vegetables easily, quickly and with pleasure at any time, while caring for nature. It has several production sites in Belgium. The site in Bree specialises in fresh-cut products. There, an existing production line was replaced with a new one for filling salsa sauces.
Long span
Pivaco was asked to build a new platform there. It had to span not only the new production line, but also run over and between the various production lines and connect to the existing platforms. The total area came to no less than 360 m². The span of the structure, without additional support columns, and the required load capacity were the biggest challenges in this new design. Pivaco project manager Bart Leten says: “Greenyard’s confidence in us to take this on grew out of earlier, smaller projects that we had successfully completed. By building and installing smaller platforms and piping runs, we had demonstrated that we could deliver the required quality.”

3D scanning for precise measurements
This was no ordinary platform. “The project stood out not only for its scale, but also for its complexity,” Leten explains. “Seven staircases had to be incorporated perfectly, taking the existing production setup into account. Once the customer’s requirements were clear, we carried out an on-site survey using a 3D scan. This gave us the ideal basis for developing the mechanical design.” Good communication with the customer was another key to success. The platform was built before the production line was in place. “We met with the customer several times to arrive at the perfect design. Our draughtsman was also in close contact with our site manager from the design stage onwards. He had previously worked on projects for Greenyard and was able to contribute useful ideas and tips, which were incorporated into the design to make installing the platform easier.”
Meeting standards
The industrial platform was designed in transportable 6 m sections. This allowed us to maximise prefabrication in our workshop and ensure smooth installation on site. The handrails and staircases were also fully prefabricated in Pivaco’s workshop. “The final installation took about a week, exactly as agreed and in line with the customer’s schedule. With a total area of 360 m², this was quite a job, and one we can be very proud of,” says Leten. Greenyard was also pleased with the result. “Thanks to Pivaco’s thorough design phase and the high-quality prefabrication and installation work that followed, Greenyard now has a platform built to last for several decades. We met their standards in terms of collaboration, follow-up and quality. The customer is happy, and that is what we do it for,” Leten concludes.
Een zakelijke vraag aan Pivaco? Get in touch
Companies in this story
Keep following this
Get an email when a new story is published. No account needed.
- ThemeBuilding and upgrading food factories
- SubjectSolutions
- CompanyPivaco




















