Solutions

Manifold at the heart of dairy production

Text Valérie CouplezImage Inex en Pivaco

Hoewel het niet de eerste is in de productie van Inex, is deze vierde manifold wel de grootste. Hij telt maar liefst 156 afsluiters die als één blok zijn samengebouwd.
Hoewel het niet de eerste is in de productie van Inex, is deze vierde manifold wel de grootste. Hij telt maar liefst 156 afsluiters die als één blok zijn samengebouwd.

Add up all the metres of pipework in a dairy factory and you are sure to arrive at an impressive total. Manifolds ensure that milk is routed through the right pipes and flows. Inex recently installed a fourth to keep pace with the company’s continued growth. Pivaco was responsible for ensuring flawless production.

At Inex, love for nature, people and animals comes first. The company makes delicious dairy products with grass-fed milk from local farmers. That is what it is all about at its home base in Bavegem, East Flanders. Around 300 million litres of grass-fed milk are processed there every year, with care, into a wide range of dairy products. The list is extensive: yoghurt, cream, milk, chocolate milk, organic dairy products, fruit-flavoured milk, desserts, buttermilk, porridge and growing-up milk. The factory now has nineteen production lines. Considerable investment has been made in recent years to further modernise and automate the site. The latest milestone is the installation of a new manifold. “The heart of production,” says Paul Piessens, senior commercial manager at Pivaco, which was responsible for its manufacture and installation. “From here, the milk is routed to the right production stages.”

Inex processes around 300 million litres of grass-fed milk a year in Bavegem.

156 valves in a single block

Although it is not the first manifold in Inex’s production facility, this fourth one is the largest. It has no fewer than 156 valves assembled into a single block. It will both expand existing capacity and optimise some of the existing flows. “It was quite exciting,” Piessens says of the manifold’s scale. “It takes a great deal of trust to place something like this in a manufacturer’s hands, particularly because of its central role in production. Pivaco was entrusted with the project because of the relationship we have built over the years. You need to know what to expect from each other. The pre-engineering was carried out by Inex’s technical department, led by Damien de Leeuw and Bart Jolie, two highly skilled engineers. The manufacturer, Bardiani Valvole, supplied the valves. Pivaco then delivered the state-of-the-art fabrication in its workshop,” Piessens explains, describing how the teams worked together. 

Orbital welding for dairy-grade quality

The choice of Bardiani was no coincidence either. Inex has standardised on the brand. “It is a relatively young brand, but it has already made a strong name for itself in the dairy industry through the quality of its products. Because the whole unit is made from a single block of stainless steel, it is not subject to expansion or contraction when temperatures change. Together with Belgian distributor Jadiflow, we used the P&ID to determine exactly which type of valve belonged in each partition. The biggest challenge was finding the right design, one that worked well for everyone, both during construction and in use. Then it was up to our team to assemble everything in the workshop using orbital welding. It takes specialists to produce a flawless weld. By choosing welders who had also worked on the earlier projects, you know that the project, however complex, is in safe hands,” Piessens adds, praising the team. 

Pivaco carried out the state-of-the-art fabrication of the manifold in its workshop.

It fits

The manifold was ultimately built in three sections, ready to be assembled and connected on site. Installing it in the existing factory required millimetre precision. “A technical feat carried out on a Sunday, the only day Inex does not produce. We handled the delivery, but also supported the Inex team during assembly. It was great to get the message that Sunday that it fit,” Piessens says with a laugh. But the job is not quite finished. It will be another six months before the manifold is fully operational. “It is a long process,” Piessens says, “because each time you have to shut down part of the factory to bring the new flow online. You also have to work on all the automation behind it to ensure seamless integration of hardware and software.     

Een zakelijke vraag aan Pivaco? Get in touch

Companies in this story

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • SubjectSolutions
  • CompanyPivaco
Share this article

Follow on FoodTec

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.