Dairy cooperative Milcobel turns milk from local farmers into dairy products sold around the world. The company has been investing in sustainable initiatives for years, many of which also make economic sense.

For a major waste heat recovery project at its site in Langemark, in West Flanders, the company partnered with DD Engineering. The result? By recovering and reusing waste heat to best effect, the project saved 26,000 tonnes of energy, cut gas consumption by 7% and reduced CO2 emissions by 3,600 tonnes a year.

Milcobel has had a combined heat and power (CHP) plant at its Langemark site since 2009. This enables the dairy cooperative to generate sustainable electricity on site. But the company wanted to go further and cut annual energy consumption by 5%. DD engineering was keen to take on the challenge with its multidisciplinary team. The CHP plant needed to become even more energy-efficient by recovering waste heat from the flue gases centrally. The heat recovery network would significantly reduce steam consumption. From defining the layout and preparing the tender documents to overseeing construction and commissioning, DD Engineering proved to be the ideal partner and adviser throughout the project.

Pipeline network fitted perfectly

The solution comprised two water circulation loops and a network of heat exchangers. Heat is extracted directly from the flue gases in the primary loop, then transferred to the water in the secondary loop. From a buffer tank, the water is fed directly to specific pasteurisation and CIP processes, where it releases its heat. The first challenge was fitting more than 2 km of pipework into already crowded spaces to reach the points of use. The primary loop was 300 m from the buffer tank. The DD Engineering team used 3D scans to determine the correct positions and engineer the layout, taking account of space, the required flexibility and maintenance considerations.

From tender documents to commissioning

To identify the right components, DD Engineering started with a clearly specified set of tender documents. As Milcobel’s partner and adviser, DD Engineering managed the negotiations, selected the most suitable supplier and handled the contractual arrangements. The customer could then confidently leave the construction work to the chosen suppliers. DD Engineering also took full responsibility for project management, ensuring that the schedule, budget and safety were managed and that the work was properly monitored. Construction took place in four phases. First, two large pipe bridges were installed. Next came the economiser in the CHP plant’s flue. Phase three involved the supporting pipework. Finally, the 25 m-high buffer tank was installed, along with 2 km of pipework and all the process components. DD Engineering handled the entire coordination, including weld inspections. Close monitoring during construction helps ensure a smoother commissioning process.

Comprehensive safety services

Once construction was complete, DD Engineering turned its attention to aftercare. Its engineers tested and checked that the installation and its components were working properly. They also provided knowledge transfer to Milcobel’s operators and engineers, offering support and explanations wherever needed. Finally, DD Engineering took care of all safety aspects of the project, including the HAZOP study, technical construction file, commissioning report and CE declaration of conformity. This supported Milcobel from start to finish, helping to get the installation up and running in the shortest possible time.

Curious about what the plant engineers at DD Engineering can do for your production floor? Get in touch with us. We’ll be happy to help.

Question about this story? Ask your question

Companies in this story

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • SubjectSustainability
  • CompanyDD Engineering
Share this article

Follow on FoodTec

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.