News

Kellanova opens Europe’s largest logistics site in Mechelen

Text Geert Van CauwenbergeImage Kellanova

Het nieuwe Kellanova magazijn in Mechelen is gelegen naast de Pringles fabriek en vlakbij de E19.
Het nieuwe Kellanova magazijn in Mechelen is gelegen naast de Pringles fabriek en vlakbij de E19.

On 28 May 2024, Kellanova, producer of Kellogg’s and Pringles, opened its largest distribution centre in Europe in Mechelen. With a floor area of 65,000 m², located next to the Pringles factory, the new distribution centre replaces the food group’s five other European logistics centres. The result? A more sustainable supply chain, from sourcing and production to delivery to consumers.

The building has a clear height of 15 m in the warehouses.

The grand opening of this impressive logistics site was attended by then Minister of the Interior Annelies Verlinden and Bart Somers, Mayor of Mechelen. The new warehouse was built by MG Real Estate and is operated in partnership with GXO. From this new site, Kellanova will distribute 250 tonnes of products a day: breakfast cereals to customers in Belgium, France, Luxembourg and the Netherlands, alongside Pringles snacks to the same countries, as well as Germany, Ireland, Italy, Spain and the United Kingdom.

On course for BREEAM Excellent certification

“Ground was broken for the building in November 2022, after which we completed the first of the four units in May 2023,” says Ignace De Paepe, President at MG Real Estate. “Together with Kellanova, we dealt with the historic soil contamination caused by a former paint factory, made maximum use of the industrial site and built a warehouse that can be carbon-neutral in the future. The building has a clear height of 15 m in the warehouses, while one of the mezzanines is 24 m deep. We have also integrated energy-efficient LED lighting and Ancra truck loading and unloading systems to streamline logistics processes and improve energy efficiency. With these technical specifications, we are aiming for BREEAM Excellent certification. Last but not least, we will install solar panels across the 65,000 m² of roof space, enabling the neighbouring Pringles factory to make maximum use of green electricity.”

With the utmost attention to a safe working environment.

A new step in sustainable development

During the opening ceremony, Mayor Bart Somers listed some more impressive figures relating to the factory, where as many as 650 million recyclable crisp tubes roll off the production line every year. A water recovery plant will save 200 million litres of water annually. Phasing out thermal oils will reduce energy consumption by 80%. And a state-of-the-art incinerator is expected to cut CO2 emissions by 35%. Olivier Vernier, VP General Manager of Kellanova Continental Europe, adds to the Mechelen mayor’s remarks: “Our largest, state-of-the-art warehouse in Mechelen gives Kellanova’s sustainability goals a major boost. By consolidating our storage operations in Belgium from five sites to one central location, we can reduce by 30% the number of lorries travelling between our production site and the warehouse. This approach fits perfectly with our ‘Better Days’ ESG strategy.”

A celebratory opening ceremony on 28 May 2024.

Impressive figures

Operational management of the brand-new warehouse is in the hands of internationally active logistics service provider GXO. Around 150 GXO employees work at the Mechelen site. They are responsible for 24/7 operations across five shifts. A further 100 employees from two sheltered workshops carry out the co-packing activities. Around forty shuttles travel daily from the nearby production site to the warehouse. More than 4,000 pallets are handled on an average working day. And at the 50 fully automated loading and unloading docks, a lorry driver can load or unload a full truckload of pallets in just five minutes.

Welcome to a brand-new warehouse ready for a sustainable future!

A model of logistics innovation

At the opening ceremony, all parties involved agreed that this Mechelen site is a model of logistics innovation and sustainable economic growth. Kellanova is also actively exploring the potential of electric freight transport. Since 2023, this FMCG player has been carrying out trials to deliver products across the Benelux in this way. Globally, Kellanova has committed to reducing emissions across the entire company in the short and long term, in line with the science-based net-zero standards of the Science Based Targets initiative (STBi).    

Question about this story? Ask your question

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ThemeRaw materials and products in motion
  • SubjectNews
Share this article

Follow on FoodTec

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.